Kirk Huntley

Kirk Huntley is the Senior Manager of Capacity Planning and Intelligent Grid at Toronto Hydro. Kirk Leads a team focused on managing the capacity of the distribution gird to safely and effectively connect new customers and distributed energy resources. Kirk joined Toronto Hydro in 2009 as an Electrical Project Engineer in the Stations and Distribution Automation group. In 2015 he moved to Project Development team as a Supervisor responsible for teams conducting the Preliminary Design of both Stations and Distribution projects within the Engineering and Construction Division. Prior to joining Toronto Hydro, Kirk has held roles in design and consulting engineering for the mining and metals extraction industry in Sudbury Ontario where he was responsible for power and automation systems design in both underground and surface mining environments.  

Kirk graduated as an Electrical Engineer from the University of Guyana in 1997. He is a Professional Engineer in the Province of Ontario.